ADU360ADU360
Check my lot, free
MenuClose
ADU360
ADU types

Above-Garage and Second-Story ADU

When the yard is too small or too valuable, the ADU goes up: over the garage or over part of the house, with its own stair. It needs more engineering than a ground-level ADU.

Above-Garage and Second-Story ADU
Up to 25 ft
height when attached
14-20 months
first call to move-in
Who it suits

Is this the right one?

01
Small yards

No ground left for a separate building.

02
Views

A second level often gets the light and the view.

03
Keeping parking

The garage stays a garage.

The rules

Rules at a glance

The state floor every city must allow. Your city may allow more.

California, 2026

RuleWhat it means
HeightUp to 25 ft or the zone limit when attached; 16 to 18 ft detached unless your city allows more
SetbacksNo more than 4 ft side and rear
StructureThe garage or house below usually needs new footings
How it runs

From address to keys

01
Lot Check

Height limits, the structure below and stair placement.

02
Design

Includes structural engineering. Usually 10 to 14 weeks.

03
Permit

Typically 4 to 7 months.

04
Build

Typically 6 to 9 months.

Floor plans

Plans that fit

Ready-drawn plans we adapt to your lot and your city.

Questions

Above-Garage and Second-Story ADU questions

Can my garage hold a second floor?

Rarely as-is. Most need new footings and posts; the engineer sizes them in design.

Would it fit on your lot?

Send the address. We check whether it fits and what it takes to build.