Garage Conversion

The walls, roof and slab are already there, so most of the money goes into the home itself: insulation, windows, a kitchen and a bath. It is often the quickest way to add a unit with its own kitchen and bath.

Garage Conversion
0
replacement parking spaces
6-10 months
first call to move-in
Who it suits

Is this the right one?

01
Owners who want rent soon

Fewer trades and a shorter permit than new construction.

02
Tight or sloped lots

No new footprint, so setbacks and grading rarely come into it.

03
A family member nearby

Close enough to help, with a door of its own.

The rules

Rules at a glance

The state floor every city must allow. Your city may allow more.

California, 2026

RuleWhat it means
SetbacksNone beyond the existing structure
Replacement parkingNot required when a garage becomes an ADU
SizeThe existing footprint, plus up to 150 sq ft for an entry by state law
Owner occupancyNot required
How it runs

From address to keys

01
Lot Check

We confirm the slab, roof framing and the sewer route before anything else.

02
Design

Layout, windows, the new entry and the energy report. Usually 4 to 8 weeks.

03
Permit

Conversions are often the quickest plan check, typically 6 to 12 weeks.

04
Build

Typically 3 to 5 months: foundation work if needed, framing, utilities, finishes.

Floor plans

Plans that fit

Ready-drawn plans we adapt to your lot and your city.

Questions

Garage Conversion questions

Do I have to replace the parking?

No. State law says a city can't require replacement parking when a garage is converted to an ADU.

Can the old slab stay?

Often, but not always. We check for cracks, moisture and the slope to the new drains in the Lot Check.

Can I add space while converting?

Usually a small amount. How much depends on setbacks and your city; we check it for your lot.

Would it fit on your lot?

Send the address. We check whether it fits and what it takes to build.