ADU360ADU360
Check my lot, free
MenuClose
ADU360
Rules by city

ADU rules in Pasadena

The key facts first, then what we've learned building there.

Key facts

The snapshot

Checked October 2026. We re-check every lot against the current code.

Pasadena

RuleAnswer
Detached ADU sizeUp to 1,200 sq ft
Setbacks4 ft side and rear
Height16 ft; 18 ft near transit; 25 ft attached
Historic districtsUnits visible from the street in landmark and historic districts are limited to 16 ft
Pre-approved plansYes: "Prototype A", a 374 sq ft studio, free citywide. The older standard plans expired December 31, 2025
Changes to a pre-approved planNot allowed: any change means a full plan review with standard fees
Pre-approved plan checkAbout 3 to 4 weeks
Eaton Fire lotsExtra pre-approved plans (about 400 to 750 sq ft) for red-tagged lots only
SB 1211 apartment ADUsYes
UtilitiesPasadena Water & Power
Building departmentPasadena Planning & Community Development
Local notes

What's different here

01
Historic districts

In landmark and historic districts, an ADU visible from the street is capped at 16 ft. We place and shape it to fit before design starts.

02
Pre-approved means no changes

Pasadena's pre-approved plans must be built as drawn; moving even a window means a full plan review. We help you decide between a free plan and a custom one.

03
Eaton Fire rebuilds

For red-tagged lots, the city lists extra pre-approved plans of about 400 to 750 sq ft. We match the plan to the lot and the rebuild.

04
Pasadena Water & Power

Pasadena runs its own utility, with its own process for service and panel upgrades. We request it early so it doesn't hold up the permit.

05
Protected trees

Pasadena has its own tree ordinance. We map protected trees before placing the ADU.

Floor plans

Plans that fit

Ready-drawn plans we adapt to your lot and your city.

Ask about your address

We check the lot against these rules and tell you what fits.