ADU360ADU360
Check my lot, free
MenuClose
ADU360
Program · Apartment owners

Up to 8 new homes behind your building

Since January 2025, California lets an existing apartment property add detached ADUs, one for every existing unit up to eight, plus conversions of garages and storage. No rezoning, no replacement parking, and often no new parking.

Up to 8
detached ADUs, never more than existing units
25%
of units again as conversions, at least 1
0
replacement parking spaces
60 days
for the city to act on a complete application
Who qualifies

You're likely a fit if

  • The lot has a building with two or more attached units (duplex, triplex, fourplex or larger)
  • It's in a zone that allows multifamily housing
  • There is room behind or beside the building, or a garage or storage to convert
  • You want rental income without buying another property
On the lot

What it looks like

The orange piece is what gets built.

SB 1211: ADUs on Apartment Lots
Real project · Maywood

Eight more homes, found on an existing lot

A 1960s apartment building, its old carports, and the law that turned them into ADUs.

14
homes before
8
new ADUs
22
homes in all
The numbers

What your building can add

Detached ADUs are capped at the number of existing units and at 8. Conversions of non-living space add at least 1, or 25% of the units.

SB 1211, by building size

Existing unitsDetached ADUsConversion ADUsUp to
2 (duplex)213 new homes
3314 new homes
4 (fourplex)415 new homes
88210 new homes
208513 new homes
How we do it

How it runs

01
Free Lot Check

How many units are allowed and where they fit. Free.

02
Site plan

Placement around parking, utilities and fire access.

03
Design and permit

Usually 4 to 8 months together, depending on the city.

04
Build

Built together so the tenants see one project, not five.

Questions

What owners ask

Do I lose parking?

A space removed to build an ADU doesn't have to be replaced under SB 1211.

Can my tenants stay during construction?

Usually yes. We phase the work around access and utilities.

What does it cost per unit?

It depends on size and site. Building several at once lowers the cost per door. After the Lot Check and design you get a written quote.

What about rent control?

New ADUs are generally free of local rent caps, and exempt from the state cap for 15 years. Eviction protections can still apply, and rules differ by city. We flag it in the Lot Check.

Sources

Where this comes from

Checked October 2026. Laws change; we re-check every project against the current code before design. General information, not legal, tax or financial advice.

Source
SB 1211 (2024), Gov. Code 66323
HCD ADU Handbook, 2025 update

Does your property qualify?

Send the address. We check it against this program and every other one.