Holiday special: Free appliance package, up to a $4,000 value, through Dec 1. · See all offers
ADU360ADU360
Check my lot, free
MenuClose
ADU360
New law · AB 956 · January 1, 2027

Two new ADUs on one house lot

From January 1, 2027, California cities must approve two new detached ADUs behind a single-family home. Until then the rule is one. Design now, apply in January.

On the lot

One today, two from January 1

A sample lot drawn to scale. Switch between the rule today and the rule from January 1.

Law starts in41d 10h 13m
Street4 ft from side and rear linesMain houseADU 2ADU 1Sample lot, 50 x 150 ft, to scale
2New detached ADUs
800Sq ft each a city must allow
4 ftSide and rear setbacks
2
new detached ADUs, up from 1
800
sq ft each a city must allow
4 ft
side and rear setbacks
Jan 1, 2027
when the law starts
Who it fits

You're likely a fit if

  • The lot has a single-family home, or one is planned
  • There is room behind or beside the house for two small homes
  • The lot is in a zone that allows a single-family home
  • Sewer, water and power can reach the back of the lot
What changes

Before and after January 1

The state floor. Your city can be more generous, never stricter.

Single-family lots in California

RuleThrough December 31, 2026From January 1, 2027
New detached ADUs a city must approve12
Size a city must allow800 sq ft800 sq ft each
Side and rear setbacksNo more than 4 ftNo more than 4 ft
Junior ADU on the same lotAllowed with one detached ADUNot required if you build two detached ADUs
Converted ADU (garage or part of the house)Also allowedAlso allowed
HOA rulesCan't block ADUs in single-family zonesCan't block ADUs in any zone that allows a single-family home
Impact fees on an ADU over 750 sq ftCounted on the whole ADUCounted only on the space above 750 sq ft
Get ready

Design now, apply in January

01
Free lot check

We check whether both units fit: setbacks, the house, access and utilities.

02
Design

Both units on one site plan and one permit set. Usually 4 to 8 weeks.

03
Apply from January 1

The city has 60 days to act on a complete application.

04
Build

Both units built together, one crew and one schedule.

Questions

Two-ADU questions

Can I build two detached ADUs right now?

Not under state law. Until December 31, 2026 cities only have to approve one new detached ADU on a single-family lot. Some cities already allow more, and we check yours.

How big can each one be?

A city can cap each unit at 800 sq ft. It can't set the cap lower. Many cities allow more.

Can I still add a junior ADU?

If you build two detached ADUs, the city doesn't have to approve a junior ADU too. A converted ADU in the garage or part of the house is still allowed.

Does it apply to duplexes and apartment buildings?

No. Lots with apartment buildings follow their own rules. An existing building can add up to 8 detached ADUs under SB 1211.

Can my HOA stop it?

HOA rules can't prohibit ADUs or restrict them unreasonably. Reasonable rules, like exterior colors, can still apply.

What about fees?

ADUs of 750 sq ft or less pay no impact fees. From 2027, a larger ADU is charged only on the space above 750 sq ft.

Sources

Where this comes from

Checked November 2026. Laws change; we re-check every project against the current code before design. General information, not legal, tax or financial advice.

Source
AB 956 (2026), signed September 29, 2026, effective January 1, 2027
SB 1117 (2026), ADU impact fees
California Government Code 66314 to 66342 (ADU law)

Will two fit on your lot?

Send the address. We check setbacks, the house and access, and tell you what fits.